• Install new PLC and SCADA system for Gold Reduction Plant (190K Tons / month
  • Install new PLC and SCADA system for mixing and blending plant of ground coffees
  • Install a new PLC / SCADA system for a refractory batching system for 80 raw material bins and 8 mixers. Recipe management, reports, deviation reports, mass balance
  • Upgrade PLC and SCADA system for a non dairy creamer mixing plant as well as an atomizer drying tower
  • Upgrade PLC and SCADA systems 2 X Coffee Spray Drying Towers and a buffer tank farm. Working together with OEM engineers.
  • Automate a new Glucose & Palm Oil Storage Tank Farm
  • Install new PLC and SCADA system for a large Rotary Kiln ( 25200 tons / month)
  • Convert an existing Coffee Spray dry tower to a non dairy creamer spray dry tower working with German OEM Engineers.
  • Automate a new CIP system to service different spray drying towers and mixing plants.
  • Replace 5 X PLC’s and code a new Archestra SCADA for a gold reduction plant (145K Tons / month)
  • Code a new Archestra SCADA system for a Gold Reduction Plant (35K Tags, 205K Tons / Month)
  • Install a new resin batching system for Top hole clay used in the metal melting furnace industry.
  • Upgrade a gelatin manufacturing plant control system including 3 X boilers. New P&ID’s, re use existing IO, new PLC’s and OMI SCADA system.
  • PLC / HMI upgrade of a 8T coal boiler in
  • New PLC / HMI /MCC system for shaking tables in a copper mine in Zambia.
  • New PLC / HMI /MCC system for shaking tables in a copper mine in Angola.
  • Lime dosing and pH control system for recovered acid mine water.
  • Integrate a new Oxygen dosing system in a gold and uranium plant.
  • IOT logging and monitoring in gold and uranium plant